Grant Clarendon OSB Plant
ALCOLU, SC
This was a 200-Acre Site Development for a new OSB Manufacturing Facility. Morgan Corp., with the assistance of subcontractors, installed a 4-stage dewatering system to perform a 45-foot excavation, of which 40 feet were below the groundwater table.
This project involved a total of 850,000 cubic yards of excavation. Morgan Corp. placed 150,000 tons of base stone, 8,000 linear feet of storm drainage (18”-42”), and 60,000 linear feet of silt fence. 16,000 linear feet of waterline (4”-16”) were installed. Installation of an on-site septic system included 2,000 linear feet of sanitary sewer lines, along with three lift stations. Morgan Corp.’s sub-grade treatment utilized 35,000 square yards of soil cement.
Notable Achievements
Morgan Corp. was able to complete this project, which was contracted for nine months, in less than eight months.