Wylie Hydro Station Floodgate Hoist Installation
FORT MILL, SC
Installation of 11 individual devoted gate hoist systems for each flood gate at the Wylie Hydro Station, and removal of the existing traveling gantry hoist structures. The scope of work consists of lead abatement, removal of existing structural steel, installation of new structural steel to support the new hoist systems, lifting and rigging of all new components from barges, alignment of the winch pinion and gears, interconnecting electrical and control installation, diving and installation of stop logs, removal of approximately 90 tons of steel, and commissioning support to start up the new system.