Our Project Portfolio Projects

Still Branch Reservoir

GRIFFIN, GA

475 acre reservoir; Earthen Dam “Category I Large Dam” – approx. 950,000 cy embankment; 100,000 cy of undercut; Outlet Structure; Drawdown Control piping; 65 ac wetlands mitigation; 1.5 mi paved roadway; 1.2 mi gravel roadway; 2,300 lf of 42” DIP & 1,900 lf of 30” DIP waterline; 735 lf of Pre-stressed Concrete Cylinder Pipe (PCCP); 540 ac of clearing; 110 ac of grassing; 9,000 tons of rip rap; 42,000 tons of aggregate drainage material.